SignOff Report

In Pennsylvania each water utility sets its own backflow test report, so the form, the address and the rules depend on who supplies the water.

Backflow test reports in Pennsylvania

This guide covers what the test record usually asks for, two published Pennsylvania forms, and the minimum readings most test procedures use. Always follow your utility's own instructions.

What a test and maintenance record asks for

The Philadelphia and Bethlehem forms share the same structure:

  1. General information: facility name and address, contact, location of the assembly, installation date, incoming line pressure, make, model, serial number, size and assembly type.
  2. Test instrument: gauge type, model and serial number, who calibrated it, and the calibration and next-due dates.
  3. Tests and repairs: check valve 1 and 2 (leaked or closed tight, pressure drop in psid), the relief valve opening point, parts cleaned or replaced, the final test after repair, the No. 2 shut-off valve condition, and passed or failed.
  4. Approvals: the certified technician's printed name, signature, certification number and date, for the initial test, repairs and final test.

Both forms also state that repairs or replacements must be completed within fourteen (14) days.

Philadelphia Water Department: Form 79-770

The Backflow Prevention Assembly Test and Maintenance Record (Form 79-770) says it must be completed by a City-certified technician. The form lists PWD Industrial Waste & Backflow Compliance, 9001 State Road, Philadelphia, PA 19136, and the email CCC.BLS@phila.gov as where completed forms go. Its assembly boxes are RPZ and DCV.

City of Bethlehem Water Bureau

Bethlehem's Test and Maintenance Record must be completed by a certified backflow assembly technician and lists 10 East Church Street, Bethlehem, PA 18018 for the completed original.

Utility pages

Other Pennsylvania utilities

Many authorities publish their own form, and some use an online portal instead. Pennsylvania American Water, for example, says on its cross-connection page that testable devices need tests reported annually through BSI Online, a third-party portal. Check your utility's website or annual test notice for the form, any filing fee and the deadline.

Minimum readings most procedures use

AssemblyCheck valve 1Check valve 2Relief valve opensAir inlet opens
RP5.0 psid or more, and above the relief opening pointTight against backpressure2.0 psid or moren/a
DC1.0 psid or more1.0 psid or moren/an/a
PVB / SVB1.0 psid or moren/an/a1.0 psid or more, then fully open

Source: AWWA Manual M14, Appendix B, Table B-5 (approved minimum test result values), as reproduced in the PNWS-AWWA field test procedures. Your utility or certifying body may use different procedures. Not affiliated with or endorsed by ABPA, AWWA or any water utility.

Before you send

Using SignOff Report for this

SignOff Report is an AI-assisted drafting tool. It fills a printable form in the field order of one of the utility forms listed above, or a generic layout, from the readings you enter or dictate. You review every field and approve; the PDF leaves the signature boxes blank, and you send it. It does not submit anything for you. Not affiliated with or endorsed by ABPA, AWWA or any water utility. How it works.